Footpath Working Group
To ensure that work starts off and continues on the right foot a Footpath Improvement Working Group has been formed by Council. The Working Group will ensure the renewal programme has an independent steer from the community on which sections of footpaths should be prioritised.
The working group is currently considering the sections of the footpath network using a number of factors including current condition, path form and function, pedestrian volumes, safety of vulnerable pedestrians, traffic hazards and feedback from the Residents Satisfaction Survey.
The working group has met to determine the initial sections of footpath to be replaced or improved by June 2023. They will also be working towards a plan for the remaining eight years of funding through to 2031.
The working group have favoured construction of new concrete footpaths to completely replace some existing footpaths that are in extremely poor condition. They also favour construction of new footpaths to complete some missing connections between existing paths.
In addition to these new footpaths, they have recommended some limited patch repairs of other existing footpaths where complete replacement of the path does not appear to be necessary.
Upcoming Works
Below are the planned footpath renewals for this year:
- Bayview St – 474m All Paths on both sides of the road – Asphalt surfacing
- Churchill St – 360m, From new life church to northern end of town – Concrete surfacing
Next years works will be updated once confirmed.